- Internal Links Page
- Antonis & Manolis Bekatoros
- Argos
- Atakoy Marina
- Bakalaris
- Bolts
- Burning
- Caulking
- Central Deckhouse and Mast
- Central Deckhouse
- Choice of Colors
- Name Choice
- The Construction of the New Gunwale
- Construction of the Deckhouses
- Docking Blocks
- Eight Tree Trunks
- Emmanuel V. Riginos
- False Keel
- “Faneromeni’s” Engine Compatrment
- “Faneromeni's” Instruments
- The First Phase of “Faneromeni’s” Reconstruction…
- “Faneromeni’s” Naval Construction Plans
- Fanouris Vasileiou
- Francis Type 2000 Two Speed
- George Mytilhnaios
- Greek Vernacular Boatbuilding
- The Halkitis Shipyard
- Homeric Cultural Center of the Municipality of Chios
- Ilias Veloudis
- Installation of Balast and a False Keel
- Installation of the Ballast
- Installation of the Onan AC Generator
- The Interior Arrangements
- Kanakis
- Keel Change
- Kelvin
- Kokinos Vraxos
- Kostas A. Damianidis
- The Koupetoris Shipyard
- Major Overhaul of the Kelvin Engine
- The Mastheads
- Mastro
- Modification of the Stern Deckhouse (Pilothouse)
- Naxos
- Nikitas Prasinos
- Nikos E. Riginos
- Notis Bilias
- Odysseas, a ship from Ithaca, 1837-1841
- Pachos Papastefanou
- Patriarch Bartholomew
- Perama
- Recessed Technique
- The Reconstruction of the Ribs
- Re-installation, after the overhaul, of the boat’s Kelvin engine and…
- The Removal of the Old Bridge
- The Removal of the Old Gunwale
- Re-Nailing
- Replacement of the Keel
- Replacement of the Gunwale
- Rolando
- Samiopoula
- Schooner
- Several Places in Greece
- Stratis Afaloniatis Lumber Yard
- Strati Afaloniati
- Submerging the Tree Trunks in the Sea
- Thanasis Dritsoulas
- The Friends and the Dogs
- Τhe Sea Remembers
- Peter Throckmorton,
- Transporting the Tree Trunks from Lesvos
- The Trunks are Transported to Mastro-Pachos’ Workshop
- Vasilis E. Riginos
- Vasilis Vallas
- Vasilis Zairopoulos
- Viron E. Riginos
- Yiannis Kakouris
- Yiannis Vlassopoulos
Central Deckhouse and Mast
After removal of the old deckhouse, mastro-Pachos contemplates how much larger to make the new opening of the hold compared to the original opening. This will determine the dimensions of the new central deckhouse and how much of the deck will need to be cut away.
(Archive of Nikos E. Riginos)
(Archive of Nikos E. Riginos)
Yiorgos Papastefanou carefully measures the precise dimensions before construction of the new deckhouse can begin.
(Archive of Nikos E. Riginos)
(Archive of Nikos E. Riginos)
In the meantime, several maintenance tasks are performed in the interior of the hold.
(Archive of Nikos E. Riginos)
(Archive of Nikos E. Riginos)
Several laths are put in place to help us decide how to arrange the interior space.
(Archive of Nikos E. Riginos)
(Archive of Nikos E. Riginos)
Several laths are put in place to help us decide how to arrange the interior space.
(Archive of Nikos E. Riginos)
(Archive of Nikos E. Riginos)
The new stainless steel fuel tank, ready for installation, arrives from the Delphinia machine shop where it was fabricated.
(Archive of Nikos E. Riginos)
(Archive of Nikos E. Riginos)
All interior wood is burned to completely remove the layers of old paint.
(Archive of Nikos E. Riginos)
(Archive of Nikos E. Riginos)
All interior wood is burned to completely remove the layers of old paint.
(Archive of Nikos E. Riginos)
(Archive of Nikos E. Riginos)
After burning, the wood is painted with minium (lead tetroxide) primer. Note: this minium primer was not obtained commercially but was made by Thanasis Dritsoulas from Lavrio minium powder mixed with linseed oil and other ingredients.
(Archive of Nikos E. Riginos)
(Archive of Nikos E. Riginos)
After burning, the wood is painted with minium (lead tetroxide) primer. Note: this minium primer was not obtained commercially but was made byThanasis Dritsoulas from Lavrio minium powder mixed with linseed oil and other ingredients.
(Archive of Nikos E. Riginos)
(Archive of Nikos E. Riginos)