- Internal Links Page
- Antonis & Manolis Bekatoros
- Argos
- Atakoy Marina
- Bakalaris
- Bolts
- Burning
- Caulking
- Central Deckhouse and Mast
- Central Deckhouse
- Choice of Colors
- Name Choice
- The Construction of the New Gunwale
- Construction of the Deckhouses
- Docking Blocks
- Eight Tree Trunks
- Emmanuel V. Riginos
- False Keel
- “Faneromeni’s” Engine Compatrment
- “Faneromeni's” Instruments
- The First Phase of “Faneromeni’s” Reconstruction…
- “Faneromeni’s” Naval Construction Plans
- Fanouris Vasileiou
- Francis Type 2000 Two Speed
- George Mytilhnaios
- Greek Vernacular Boatbuilding
- The Halkitis Shipyard
- Homeric Cultural Center of the Municipality of Chios
- Ilias Veloudis
- Installation of Balast and a False Keel
- Installation of the Ballast
- Installation of the Onan AC Generator
- The Interior Arrangements
- Kanakis
- Keel Change
- Kelvin
- Kokinos Vraxos
- Kostas A. Damianidis
- The Koupetoris Shipyard
- Major Overhaul of the Kelvin Engine
- The Mastheads
- Mastro
- Modification of the Stern Deckhouse (Pilothouse)
- Naxos
- Nikitas Prasinos
- Nikos E. Riginos
- Notis Bilias
- Odysseas, a ship from Ithaca, 1837-1841
- Pachos Papastefanou
- Patriarch Bartholomew
- Perama
- Recessed Technique
- The Reconstruction of the Ribs
- Re-installation, after the overhaul, of the boat’s Kelvin engine and…
- The Removal of the Old Bridge
- The Removal of the Old Gunwale
- Re-Nailing
- Replacement of the Keel
- Replacement of the Gunwale
- Rolando
- Samiopoula
- Schooner
- Several Places in Greece
- Stratis Afaloniatis Lumber Yard
- Strati Afaloniati
- Submerging the Tree Trunks in the Sea
- Thanasis Dritsoulas
- The Friends and the Dogs
- Τhe Sea Remembers
- Peter Throckmorton,
- Transporting the Tree Trunks from Lesvos
- The Trunks are Transported to Mastro-Pachos’ Workshop
- Vasilis E. Riginos
- Vasilis Vallas
- Vasilis Zairopoulos
- Viron E. Riginos
- Yiannis Kakouris
- Yiannis Vlassopoulos
Re-Nailing
New nails are added to the planking in order to re-enforce their adhesion to the ribs. This adhesion could have been weakened by the oxidation of the old nails. The new nails are punched in deep into the wood and then are covered with putty.
